Vertical Fiber Enclosure Dome type GJS03-M1AX-96C(with fiber basket),GJS03S-96C, FOSC 400 A4

Short Description:

This product is used to connect the distribution cable and the incoming cable, is widely applied in communication, network systems, CATV cable TV and so on. It adopts scientifically formulated engineering plastic and be shaped by injection molding, with anti-aging, anti-corrosion, flame retardant, waterproof, anti-vibration and anti-shock effects. Can effectively prevent the optic fibers from the influence of outdoor environment.
Dome-to-base design; up to 4 pieces splice trays, hinge for access of any splice without disturbing others trays; Fast and reliable sealing performance, easy to package multiple times. With lightning protection grounding device, it can be applied in overhead, wall mounting or directly buried.


  • FOB Price: US $0.5 - 9,999 / Piece
  • Min.Order Quantity: 100 Piece/Pieces
  • Supply Ability: 10000 Piece/Pieces per Month
  • Product Detail

    Product Tags

    Specifications

    Model GJS03-M1AX- 96-***
    Size:With clamp’s biggest outer dia. 422.3*219.2 mm Raw material Dome, Base: modified PP,  clamp:Nylon +GFTray: ABSMetal parts:Stainless steel
    Entry ports number: 1 oval port,4 round ports Available cable dia. Oval port:available for 2 pcs, 10~29mm cablesRound ports:Each available for 1pc 6-24mm cable
    Max. tray number 4 trays Base sealing method Heat-shrink
    Tray capacity 24F Applications Aerial, directly buried, Wall/pole mounting
    Max. closure splice capacity 96F IP grade 68

    Order Guidance

    GJS03-M1AX-96D_40

    Exterior Structure Diagram

    GJS03-M1AX-96D_52

    Technical Parameter

    1. Working Temperature: -40 degrees centigrade~+65 degrees centigrade
    2. Atmospheric Pressure: 62~106Kpa
    3. Axial Tension: >1000N/1min
    4. Flatten Resistance: 2000N/100 mm (1min)
    5. Insulation resistance: >2*104MΩ
    6. Voltage Strength: 15KV(DC)/1min, no arc over or breakdown
    7. Temperature recycle: under -40℃~+65℃,with 60(+5)Kpa inner pressure, in 10cycles; Inner pressure shall decrease less than 5 Kpa when closure turn to normal temperature.
    8. Durability:25 years

    GJS03-M1AX-96D_35

    Main Components

    Name Qty Picture Name Qty Picture
    Dome 1pc GJS03-M1AX-96D_42 Tray Max.4 pcsoptional GJS03-M1AX-96D_26RQP-06-24c middle splice
     GJS03-M1AX-96D_55RQP-08-24c side splice
    Clamp 1pc GJS03-M1AX-96D_12 Valve 1 GJS03-M1AX-96D_27optional
    Base 1pc GJS03-M1AX-96D_35 Modified O-ring 1 GJS03-M1AX-96D_08
    Cable Strengthen member attach plate 1set GJS03-M1AX-96D_23 Velcro strip with one X flake 1 GJS03-M1AX-96D_07
    optic joints protection tube Max. 96 GJS03-M1AX-96D_16 Ground feed-through lug 1 GJS03-M1AX-96D_30
    optional
    Metal Storage basket 1 standard offered GJS03-M1AX-96D_44 Plastic storage basket 1Orderd as optional GJS03-M1AX-96D_33
    Nylon tie &  Transparent PE tube 8pcs/bag GJS03-M1AX-96D_19GJS03-M1AX-96D_03
    Each two trays with 1 bag.
    Wall mounting kits 1Standard offered with GJS03-M1AX-96D_05 GJS03-M1AX-96D_50
    Aerial mounting kits Order as optional GJS03-M1AX-96D_18GJS03-M1AX-96D_53
    Pole mounting kits Order as optional GJS03-M1AX-96D_20 GJS03-M1AX-96D_32
    Round Port accessories bag 1 bag GJS03-M1AX-96D_01 Items Heat-shrink tube 4 GJS03-M1AX-96D_43
    Abrasive tape 1 GJS03-M1AX-96D_38
    Aluminium foil 4 GJS03-M1AX-96D_13
    Oval port accessories bag 1bag GJS03-M1AX-96D_06 Items Heat-shrink tube 1 GJS03-M1AX-96D_09
    Abrasive tape 1 GJS03-M1AX-96D_38
    Aluminium foil 2 GJS03-M1AX-96D_13
    Cleaning tissue 1 GJS03-M1AX-96D_41optional
    Desiccant 1 GJS03-M1AX-96D_10optional
    Shield continuity wire 1 GJS03-M1AX-96D_02optional
    AMP clamp 1 GJS03-M1AX-96D_25optional
    Branch off clip 1 GJS03-M1AX-96D_17

    Installation Guidance

    GJS03-M1AX-96D_22

    1. Cut the ports need to guide-in cable

    GJS03-M1AX-96D_37

    2. Put the cable through the heat-shrink tube

    GJS03-M1AX-96D_46

    3. Remove the sheath of the cable and clean it. Cut the strengthen member to 5cm length. Put it through the attach screws and bend it to fix on the screw. Then tighten the screw.

    GJS03-M1AX-96D_04

    4. Remove the loose tube of the cable and clean the bare fibers. Put them through the transparent PE tube. Using PVC tape to wrap the end of the PE tube and cable.

    GJS03-M1AX-96D_004

    5. Wind the excessive loose buffers in suitable cycles and put in the storage basket.

    GJS03-M1AX-96D_003

    6. Coiling the optic fibers in the splice trays as above picture from the bottom tray to the top one. Fusion the joints and shrink the protective tubes and fix them in the tray. And put on the tray lid.

    GJS03-M1AX-96D_005

    7. Use the Velcro strip to bind the trays.

    GJS03-M1AX-96D_005

    8.Using abrasive strip to rough the surface of the cable sheath and ports slightly.

    GJS03-M1AX-96D_006

    9. Clean the cable surface and ports

    GJS03-M1AX-96D_009

    10. Move the heat-shrink tube to cover the base port and the cable. Mark the tube end on the cable and stick the aluminum film on it. The blue line of the film shall at the same position of the marked place. ( Edge which close to the blue line shall be in the tube. Other side out of the tube.) Using blunt tool to even the film tightly stick to the cable.  Heat the tube to shrink to seal from the direction of the red arrow slowly. (If to guide 2 cables in the oval port, use branch off clips to separate the cables , heat the branch off clip at meantime to seal the space.)

    GJS03-M1AX-96D_007

    11. heat the round ports follow the same step as the oval port

    GJS03-M1AX-96D_0011

    12.  close the closure with the clamp.

    GJS03-M1AX-96D_0012

    13.Choose the suitable mounting kits for different installation environment.









  • Previous:
  • Next:

  • Write your message here and send it to us